Home › Processing › Steel structure drawing deepening
Fabrication service · 2,000 m2 shop · drawing accepted

Steel structure drawing deepening

When you have no drawing, an incomplete drawing, or only an architectural drawing without fabrication drawings, we can deepen the design to a cut-ready state: check axes and column grids, number components, draw node details, mark bolts and welds, and issue a material list and component weight schedule. Once the deepening drawing is confirmed, fabrication follows it: cutting, assembly, welding, derusting, primer and hot-dip galvanizing. Component numbers correspond one-to-one with the delivery list, so the site can lift by number without searching for parts.

Processing examples

Real in-process and finished parts from our centre. Compare with your component type; each photo notes the processes involved.

Processes involved

Cutting

Plasma, flame and saw cutting; profiles, bevels and cut-to-length per the deepening drawing.

Welding

CO2 MIG and TIG; tack then full weld; critical welds visually and dimensionally inspected.

Punching

Holes to drawing position and diameter; jig-located for batch consistency.

Common finished products

Frequently asked questions

How long does deepening take?

For a standard workshop with a modest number of components, usually 2-3 working days. Complex nodes or projects with hundreds of components are scheduled by week; axes and load conditions are confirmed before drawing.

Is there an extra charge for deepening?

Charged by component tonnage or number of drawings. When we supply and fabricate the whole order, the deepening cost is usually absorbed in the fabrication fee; drawing-only work is quoted per project.

How detailed is the deepening drawing?

Cut-ready detail: component numbers, section sizes, lengths, hole positions, bevels, node details, bolt specifications and quantities, material list and component weight schedule.

Who approves the deepening drawing?

We self-check, then submit to you or your designer for confirmation and signature. Only the approved version is used for cutting. Changes require re-issuing the drawing and synchronising any parts already cut.

Related services